PM Surya Ghar rooftop solar subsidy in Andaman & Nicobar Islands — up to ₹85,800 central assistance, net-metering readiness, and estimated savings for your home.
Andaman & Nicobar Islands receives an estimated 1,350 kWh per kW per year of solar irradiance — one of India's lower-irradiance regions. A 3 kW rooftop system covers roughly 4100 kWh/year — enough for a typical urban household.
₹85,800
Max central subsidy
1,350
kWh / kW / year (est.)
0/—
Net-metering DISCOMs
0
Listed installers
Under the PM Surya Ghar: Muft Bijli Yojana, residential rooftop solar in Andaman & Nicobar Islands receives Central Financial Assistance of ₹33,000 per kW up to 2 kW, an additional ₹19,800 per kW for the 2–3 kW slab, capped at ₹85,800 for systems of 3 kW and above (higher special-category rate). The subsidy is credited directly to your bank account after installation and inspection.
| System | Subsidy | Net cost* | Annual units | Annual savings | Payback |
|---|---|---|---|---|---|
| 1 kW | ₹33,000 | ₹27,000 | 1,350 | ₹9,450 | 2.9 yrs |
| 2 kW | ₹66,000 | ₹54,000 | 2,700 | ₹18,900 | 2.9 yrs |
| 3 kW | ₹85,800 | ₹94,200 | 4,050 | ₹28,350 | 3.3 yrs |
| 5 kW | ₹85,800 | ₹2.14 L | 6,750 | ₹47,250 | 4.5 yrs |
*Indicative: ₹60,000/kW turnkey cost, ₹7/kWh tariff, and Andaman & Nicobar Islands's estimated 1,350 kWh/kW/year yield. Actual figures vary by vendor, roof, and DISCOM tariff. Use a precise calculator →
DISCOM data for Andaman & Nicobar Islands is being expanded — see the full DISCOM directory.
View all DISCOM net-metering policiesResidential rooftop systems in Andaman & Nicobar Islands qualify for the PM Surya Ghar Central Financial Assistance: ₹33,000/kW up to 2 kW and ₹19,800 for the 3rd kW (special-category rate), capped at ₹85,800 for systems of 3 kW and above.
At an indicative turnkey cost of ₹60,000/kW, a 3 kW system is about ₹1,80,000 gross. After ₹85,800 of subsidy, the net cost is roughly ₹94,200, generating an estimated 4,050 kWh/year in Andaman & Nicobar Islands — a payback of about 3.3 years.
Net metering in Andaman & Nicobar Islands is administered by your local DISCOM. Check your DISCOM's net-metering status on the SolarPanti DISCOM directory.
Based on Andaman & Nicobar Islands's solar resource, 1 kW of rooftop solar generates an estimated 1,350 kWh per year (about 9,450 rupees of avoided electricity cost annually). Actual output depends on roof orientation, shading, and system quality.
Register on the national PM Surya Ghar portal, apply through your Andaman & Nicobar Islands DISCOM, get a registered vendor to install an approved system, request net metering and inspection, then submit your details and bank account — the subsidy is credited directly. SolarPanti guides you through each step.